- Arts & Culture 5947
- Business & Economics 688
- Computers 316
- Dictionaries & Encyclopedias 81
- Education & Science 76270
- Engineering 3062
- Aircraft 39
- Audio, Video 3
- Auto 121
- Construction 171
- Digital Technique 2201
- Energetics 7
- Household Appliances 5
- Industry 146
- Military Equipment 80
- Motorcycles 14
- Regulatory Documentation 112
- Ships 13
- Technology and Electronics 128
- Trains 14
- Weapon 8
- Fiction 696
- House, Family & Entertainment 107
- Law 132
- Website Promotion 71
PPR 35
Uploaded: 09.03.2020
Content: text 31 symbols
Product description
Project Production Work (PPR). Installation of ventilation and air conditioning systems
Additional information
Document * .doc; 162 pp .; When linking a typical project for the execution of works to the local conditions of the facility, two options are allowed: 1) a project issued in full: an element of the construction plan of the facility is necessarily developed (see Fig. 58) and all forms 1-8 are filled out (annexes to the explanatory note). 2) a project issued in an abridged version: an element of the construction plan is necessarily developed and forms 1, 2, 6 are filled out (annexes to the explanatory note). The materials of the appendix to the explanatory note and the element of the construction plan are attached to the PPR in the form of a separate folder (folder). A typical project of work performance, tied to local conditions, must be agreed with the chief mechanic and safety engineer, approved by the chief engineer of the installation department, and then transferred for execution to the installation object. 2.1. Form 1. The main technical and economic indicators. 2.2. Form 2. Schedule of work and schedule the needs of workers. 2.3. Form 3. Schedule of delivery of air ducts. 2.4. Form 4. Schedule of supply of ventilation equipment. 2.5. The form. 5. Statement of basic and auxiliary materials. 2.6. Form 6. Statement of needs of the tool, fixtures and mechanisms for the production of work. 2.7. Form 7. Consolidated statement of labor costs and wages. 2.8. Form 8. Production cost estimates for labor and wages for the installation of air ducts and ventilation equipment. ";
Feedback
0Period | |||
1 month | 3 months | 12 months | |
0 | 0 | 0 | |
0 | 0 | 0 |