- Arts & Culture 5941
- Business & Economics 689
- Computers 319
- Dictionaries & Encyclopedias 81
- Education & Science 75930
- Engineering 3063
- Aircraft 39
- Audio, Video 3
- Auto 121
- Construction 171
- Digital Technique 2201
- Energetics 8
- Household Appliances 5
- Industry 146
- Military Equipment 80
- Motorcycles 14
- Regulatory Documentation 112
- Ships 13
- Technology and Electronics 128
- Trains 14
- Weapon 8
- Fiction 696
- House, Family & Entertainment 107
- Law 132
- Website Promotion 71
PPR 86
Uploaded: 09.03.2020
Content: text 31 symbols
Additional information
Document * .djvu; 49 pp .;
General description of the installation of the new steam recovery boiler E-160-3.9-440GT, namely: installation of the recovery boiler itself and auxiliary equipment, installation of gas and air ducts from the gas turbine to the boiler including discharge to the atmosphere (bypass) , within the boiler and from the boiler to the existing chimney. The boiler and auxiliary equipment will be installed in the existing boiler room within the construction cell of the dismantled boiler SRK No. 2. The manufacturer of the boiler is Energomashstroy, Belgorod ";
Feedback
0Period | |||
1 month | 3 months | 12 months | |
0 | 0 | 0 | |
0 | 0 | 0 |